1) Installation and supply tanks for absorbing chlorine by GRP and upgrades Truong An water treatment plant from 20,000 m3/day to 40,000 m3/day (with pumping station)
Project information:
Installation of the entire system (M&E contractors) for the project
Implementation period: 8 months (07/2013)
Investor: Vinh Long Water Supply Company Limited
Location: No. 519, Tan Vinh Thuan Hamlet, Tan Ngai Ward, Vinh Long City, Vinh Long Province
Realistic photos:
>>> Details
2) Construction of Duyen Hai water treatment plant capacity of 9,600 m3/day (equipment + van and watches)
Project information:
Installation of the entire system (M&E contractors) for the project
Implementation period: 8 months (07/2014)
Investor: Tra Vinh Water Supply Company Limited
Location: Long Thanh Hamlet, Ward 1, Duyen Hai Town, Tra Vinh Province
Realistic photos:
>>> Details
3) Installation and supply tanks for chlorine absorbing by GRP and upgrades Dong Xoai water treatment plant from 20,000 m3/day (with pumping station)
Project information:
Installation of the entire system (M & E contractors) for the project
Implementation period: 8 months (08/2014)
Investor: Binh Phuoc Water Supply Company Limited
Location: Thuan Loi Hamlet, Dong Phu District, Binh Phuoc Province
Realistic photos:
>>> Details